LOCAL BUSINESSES

Please get in touch early to register your interest in supplying to the project, should planning permission be approved

Have Your Say

You can voice your opinion by registering and leaving feedback.

Links and Downloads

Project Information

Background Information

Common Concerns about Wind Power (2017)

British Electricity Live

About the developers

Coriolis Energy

ESB

Scoping Report

Detailed Map

Environmental Statement

Non Technical Summary

Volume 1 - EIAR Main Report

Volume 2a - Figure 2.1 - Proposed Development Layout

Volume 2a - Figure 2.2 - Design Iterations

Volume 2a - Figure 2.3 - Turbine Elevations

Volume 2a - Figure 2.4 - Indicative Turbine Foundations

Volume 2a - Figure 2.5 - Indicative Turbine Hardstandings

Volume 2a - Figure 2.6 - Indicative Access Tracks and Cable Runs

Volume 2a - Figure 2.7 - Indicative Substation Compound

Volume 2a - Figure 2.8 - Indicative Substation Building

Volume 2a - Figure 2.9 - Indicative Control Building

Volume 2a - Figure 2.10 - Indicative Battery Storage Facility

Volume 2a - Figure 2.11 - Indicative Battery Storage Elements

Voulme 2a - Figure 2.12 - Indicative Wind Monitoring Mast

Volume 2a - Figure 2.13 - Indicative Construction Compounds

Volume 2a - Figure 5.1 - National Designations 45km

Volume 2a - Figure 5.2 - Landscape Character 45km

Volume 2a - Figure 5.3 - Bare Ground Tip ZTV 45km

Volume 2a - Figure 5.4 - Bare Ground Hub ZTV 45km

Volume 2a - Figure 5.5 - Screening ZTV 20km

Volume 2a - Figure 5.6 - Topography 20km

Volume 2a - Figure 5.7 - Landscape Character with Screening ZTV 20km

Volume 2a - Figure 5.8 - Designations with Screening ZTV 20km

Volume 2a - Figure 5.9 - Recreational Receptors with Screening ZTV 20km

Volume 2a - Figure 5.10 - A7 Sequential Visibility

Volume 2a - Figure 5.11 - Cumulative Search Area 45km

Volume 2a - Figure 5.12 - Cumulative ZTV Op Cons 20km

Volume 2a - Figure 5.13 - Cumulative ZTV Scawd Law 20km

Volume 2a - Figure 5.14 - LCA with Light Environment 20km

Volume 2a - Figure 5.15 - Aviation Lighting ZTV 20km

Volume 2a - Figure 6.1 - Known Heritage Assets

Volume 2a - Figure 6.2 - Designated Heritage Assets

Volume 2a - Figure 6.3 - Heritage Viewpoints

Volume 2a - Figure 7.1 - Designated Sites (10km)

Volume 2a - Figure 7.2 - Phase 1 Habitat Survey

Volume 2a - Figure 7.3 - National Vegetation Classification Survey

Volume 2a - Figure 7.4 - Ground Water Dependant Terrestrial Ecosystems Survey

Volume 2a - Figure 7.5 - Notable Plant Species Records (1km) 

Volume 2a - Figure 7.6 - Protected Species Survey 1km

Volume 2a - Figure 7.7 - Static Bat Detector Results

Volume 2a - Figure 7.8 - Protected Species Survey

Volume 2a - Figure 7.9 - Bat Mitigation Measures (Tree Exclusions)

Volume 2a - Figure 7.10 - Habitat Management Proposals

Volume 2a - Figure 8.1 - Main Site 500m Buffer

Volume 2a - Figure 8.2 - Observations Vantage Points

Volume 2a - Figure 8.3 - Selected Designations

Volume 2a - Figure 8.4 - Breeding Birds Survey Data

Volume 2a - Figure 8.5 - VP Herring Gull

Volume 2a - Figure 8.6 - VP Raptors

Volume 2a - Figure 8.7 - VP Waders Curlew

Volume 2a - Figure 8.8 - VP Waders Golden Plover

Volume 2a - Figure 8.9 - VP Waders Lapwing

Volume 2a - Figure 8.10 - VP Snipe

Volume 2a - Figure 9.2a - Bedrock Geology Mapping

Volume 2a - Figure 9.2b - Superficial Geology Mapping

Volume 2a - Figure 9.3a - Soils Mapping

Volume 2a - Figure 9.3b - Peat & Carbon Mapping

Volume 2a - Figure 9.4 - Peat Depth

Volume 2a - Figure 9.5 - Hydrological Catchments

Volume 2a - Figure 9.6 - Private Water Supplies

Volume 2a - Figure 9.7 - Water Quality Monitoring Locations

Volume 2a - Figure 10.1 - Noise Monitoring & Assessment Locations with Predicted Noise Levels From The Proposed Development, Operating Unconstrained

Volume 2a - Figure 10.2 - Noise Monitoring & Assessment Locations with Predicted Noise Levels From The Proposed Development, Operational Mitigation

Volume 2a - Figure 11.1 - Automatic Traffic Counter Locations

Volume 2a - Figure 11.2 - Location and Severity of Traffic Accidents Within Study Area

Volume 2a - Figure 11.3 - Proposed Construction Traffic Routes (Including AIL)

Volume 2a - Figure 12.1 - Socio- Economic Receptors

Volume 2b - Illustrative Viewpoint A - H Wirelines

Volume 2b - Viewpoint 1 - B6368 Crookston

Volume 2b - Viewpoint 2 - Core Path 33 Heriot

Volume 2b - Viewpoint 3 - A7 Hangingshaw

Volume 2b - Viewpoint 4 - Fountainhall

Volume 2b - Viewpoint 5 - Nettlingflat

Volume 2b - Viewpoint 6 - B7007 NW of Site

Volume 2b - Viewpoint 7 - Windlestraw Law

Volume 2b - Viewpoint 8 - Blackhope Scar

Volume 2b - Viewpoint 9 - Stow

Volume 2b - Viewpoint 10 - Core Path 22 SW of Oxton

Volume 2b - Viewpoint 11 - Lauder Common

Volume 2b - Viewpoint 12 - Gorebridge

Volume 2b - Viewpoint 13 - Wanton Wells Southern Upland Way

Volume 2b - Viewpoint 14 - A697 near Lauder

Volume 2b - Viewpoint 15 - The Three Brethren Southern Upland Way

Volume 2b - Viewpoint 16 - Eildon Mid Hill 

Volume 2b - Viewpoint 17 - Twinlaw Cairns Southern Upland Way

Volume 2b - Viewpoint 18 - Scald Law

Volume 2b - Viewpoint 19 - Arthurs Seat

Volume 2c - Residential and Visual Amenity Assessment (RVAA) Visualisations

Volume 2d - Figure 6.4 - Corsehope Rings Fort SM1166

Volume 2d - Figure 6.5 - Haltree Rings Settlement, Chapel Hill SM1170

Volume 2d - Figure 6.6 - Hodge Cairn Fort, Shank Wood, SM1171

Volume 2d - Figure 6.7 - Symington Hillhead Fort, SM1179

Volume 2d - Figure 6.8 - Middlehill Fort, SM1176

Volume 2d - Figure 6.9 - Crookston House and Garden, CatB LB13895

Volume 3 - Appendix 2.1 - Forestry Assessment

Volume 3 - Appendix 3.1 - Consultation Matrix

Volume 3 - Appendix 5.1 - LVIA Methodology

Volume 3 - Appendix 5.2 - Visuals Methodology

Volume 3 - Appendix 5.3 - Viewpoint Analysis

Volume 3 - Appendix 5.4 - Landscape Sensitivity

Volume 3 - Appendix 5.5 - Effects Less Than Moderate

Volume 3 - Appendix 5.6 - Night Time VP Analysis

Volume 3 - Appendix 5.7 - Residential Visual Amenity Assessment

Volume 3 - Appendix 5.8 - Aviation Lighting Assessment

Volume 3 - Appendix 6.1 - Archaeological Desk Based Assessment and Stage 1 Setting Assessment

Volume 3 - Appendix 7.1 - NVC Survey Report

Volume 3 - Appendix 7.3 - Bat Survey and Baseline Report

Volume 3 - Appendix 8.1 - Ornithology Technical Appendix

Volume 3 - Appendix 9.1 - Borrow Pit Assessment

Volume 3 - Appendix 9.2 - Groundwater-Dependent Terrestrial Ecosystems Assessment

Volume 3 - Appendix 9.3 - Drainage Impact and Watercourse Crossing Assessment

Volume 3 - Appendix 10.1 - Environmental Noise Assessment

Volume 3 - Appendix 11.1 - Abnormal Indivisible Load Route Survey

Volume 3 - Appendix 13.1 - Carbon Balance Inputs

Volume 3 - Appendix 14.1 - Telecommunications Impact Assessment

Volume 3 - Appendix 14.2 - Shadow Flicker Report

Statement of Community Consultation

Planning Statement

01_Greystone_Knowe_Additional_Information_report_Rev02.pdf

links and downloads